Return to WNC Home Page Skip Navigation A-Z IndexMapsFaculty and Staff DirectoryContact Us

Schedule of Classes: Fall 2008


Construction
CONS 262B: Above-Floor Inspections for Certified Inspector


Provides instruction on all of the above-floor components typical of residential construction. Seismic and structural hardware will be discussed as will load-bearing, load-transferring and non-load-bearing assemblies. Extensive mechanical and electrical systems analyses will be conducted. Students will prepare extensive narrative inspection reports for evaluation, and sign "hold harmless" waivers when conducting inspections off state property. Students are strongly encouraged to have medical insurance that provides coverage in the event of a job-site injury.

See all Construction courses in the schedule of classes.

Fall 2008 Sections of this Course


Press + to add a class to the class schedule planner.

Call # Course Cr. Location Days Times +
CONS 262B Above-Floor Inspections for Certified Inspector
31148 CONS 262B C01 2 Carson City Fri
Sat
8 am–5 pm
8 am–5 pm
  Class Meets: October 3–October 11

All classes are full length semester courses (Fall 2008 is August 25–December 13) unless otherwise noted.

NOTE: Classes with low registration numbers may result in the class being canceled. Students are encouraged to register and pay early to reduce the chance of class cancellation. NEW EARLIER PAY DATE: Payment is due for full-term fall 2008 classes by August 15, 2008.

Return to WNC Home Page © 2008 Western Nevada College
Privacy Policy | Site Policies | WNC en Español | Home
Information: 775-445-3000
General Questions: info_desk@wnc.edu